Skip to main content
OneQA representative icon

Workflow Automation Software

Can you explain a little more about the Power On Delay and Power Off Delay selections in Electrical Safety Test Containers in Ansur? Also, please clarify the use of "Stop Before New Power Configuration" and "Stop After New Power Configuration"?

All electrical safety plug-ins are powering off and then applying the delay. This is to ensure a minimum time with power turned off before turning it on again, in addition to let the DUT stabilize after powering off.

This is also consistent with the way the Power On Delay is implemented. The DUT power is switched on and then the delay is applied, allowing the DUT to stabilize after powering it on.

If you want to perform any actions before powering on or off a DUT, you should use the "Stop Before New Power Configuration" and/or "Stop After New Power Configuration" options.

Can I delete the Ansur Test Library or move it to a different directory/folder on a different server?

Fluke Biomedical strongly suggests that you do not delete or move the Ansur Test Library. This directory is part of the Ansur Test Executive program and is needed for the Ansur software suite to work properly. It is also a convenient way for Fluke Biomedical to provide the customer with some "starter" or "generic" Ansur test templates. These "starter" templates can be:

Ansur opens with a display screen to create a new template. How do I use an existing template?

For Ansur Test Executive version 2.50.00: This new version creates a shortcut on the computer desktop called "Ansur Test Library". When the user double-clicks this shortcut, the Ansur Test Library is displayed. All of the ready-for-use test templates can be found in the Ansur Test Library, unless the user has created a test template and saved it in some other location. Navigate to the template desired, and double-click on that file. The test template will open in the Ansur Test Guide View, ready-to-use.